BOOK AN INSPECTION
Call usBook inspection
Batten out

Batten out,
no strip-out.

A brand-new ceiling fixed underneath the old one, battened out or dropped and framed out to allow for electrical and aircon.

Book an inspection
Batten out

Not every old ceiling has to come down. Where the old ceiling and the joists above are suitable, we batten out underneath it and fix a brand-new ceiling to the new battens.

Battens up under the old ceiling.
Battens up under the old ceiling.

When we batten out

  • Horsehair ceilings pulling away from the joists
  • Lath and plaster that is only cracking with age
  • Bedrooms and hallways with no heavy loads above
  • Where you want less mess and dust
  • Dropping the ceiling to make room for electrical and ducted aircon
Not sure?

Tell us what you’re seeing. If it needs a closer look, one of our experienced team will come out, check the ceiling and roof space, and give you a fixed price in writing.

Before & after

From battens to a brand-new ceiling.

BeforeCoffered alfresco ceiling: before
FinishedCoffered alfresco ceiling: finished
Coffered alfresco ceiling
Battens upLiving room: battens up
New ceilingLiving room: new ceiling
Living room
Battens upStraw ceilings with feature beams and brick walls: battens up
New ceilingStraw ceilings with feature beams and brick walls: new ceiling
Straw ceilings with feature beams and brick walls
Or drop the ceiling

Room for electrical and aircon.

Instead of battening straight onto the old ceiling, we can frame out a dropped ceiling below it. That leaves room above for wiring, downlights and ducted air conditioning, and bulkheads can be built in at the same time.

The old ceiling still stays up, so there is no strip-out, and the new ceiling goes up the same way: glued, screwed, back-blocked and finished to a Level 4 standard.

Framed outDropped bulkhead framed out to allow for new aircon
FinishedDropped bulkhead finished, ready for new aircon
Dropped bulkhead to allow for new aircon
Dropped ceiling framed out under a concrete ceiling
Framed out under a concrete ceiling, to allow for downlights

Our batten out system

01
90 × 35 pine battens

Fixed into the joists with 100 mm bugle screws, so everything is locked in and stronger than when it started.

02
Old ceiling stays up

No tonnes of old plaster through your home, and the existing insulation stays where it is.

03
Only 45 mm lower

Most homes from this era have ceilings well above 3 metres, so you won’t notice it.

04
Square set or any cornice

Go for a clean square set, match your existing cornice, or choose something completely different.

Step by step

The process

The ACR team on a finished batten out job
  1. Inspection and proposal

    We check the ceiling and the timbers above to make sure battening out is the right method, measure every room and photograph everything. You get a fixed price in writing.

  2. Lock in your date

    Once you say yes, we lock in a date that works for you, and that’s the date we’ll be there. It only moves for a genuine emergency.

  3. Protect the room

    Floors and furniture covered, and any old cornice removed and disposed of if needed.

  4. Batten out

    Battens fixed through the old ceiling into the joists, pulling it back up and locking it in.

  5. New ceiling

    Knauf Sheetrock One glued and screwed to the battens, joints back-blocked, Fibafuse tape and a Level 4 finish, then a square set or your chosen cornice.

  6. Clean-up

    We clean up and take all the waste away.

Our work

Recent batten out jobs

New ceiling, ready for paint
New ceiling, ready for paint
New ceiling, painted
New ceiling, painted
New ceiling and cornice
New ceiling and cornice
New ceiling, painted
New ceiling, painted
Hallway, new ceiling and cornice
Hallway, new ceiling and cornice
Battens fixed under the old ceiling
Battens fixed under the old ceiling
The customer wanted a lower ceiling so we framed it out
The customer wanted a lower ceiling so we framed it out
New sheets up and flushing started
New sheets up and flushing started
After a sand it’s ready for paint
After a sand it’s ready for paint
Hallway, new ceiling
Hallway, new ceiling
Hallway, new ceiling and rose
Hallway, new ceiling and rose
Hallway, new ceiling, ready for paint
Hallway, new ceiling, ready for paint
What customers say

Latest Google reviews

★★★★★

“Adelaide Ceiling Replacements did a fantastic job! A big shout out to your exceptional team and their thoroughly professional work.”

Toni C. · Google · Oct 2026
★★★★★

“ACR did a great job with replacing our ceiling. The old ceiling came down in the new one went up in a single day. The painting happened two days later. The guys were very friendly, cognizant that we were still living at home while the work was being done and did a great job of cleaning up afterwards. I would highly recommend them.”

Paul B. · Google · Oct 2026
★★★★★

“Great to deal with. Quality job by Quality tradesmen. Very tidy. Highly recommended Thanks”

Mick D. · Google · Oct 2026
5.0
34 Google reviews · read them →

Questions

Anything else you’d like to know? Call or text us on 0402 252 511.

When do you strip out instead?

If a lath and plaster ceiling is sagging, it is usually because the joists above have sagged under its weight. That ceiling has to come down so we can straighten and level the joists.

Can you drop the ceiling instead?

Yes. We can frame out a dropped ceiling below the old one to allow for electrical, downlights and ducted air conditioning, and build bulkheads at the same time. We can also frame out walls.

Is there a warranty?

Yes. House ceilings carry a 5-year workmanship warranty, and materials are covered by the manufacturer’s warranty.

How long does it take?

A typical room of about 16 m² takes a team of two about a day, plus painting where it is included.

Start with a conversation.

Tell us about your ceiling, and add a few photos if you can. One of our experienced team will call to talk it through and, if it needs a look, book a time to inspect it. You can also text photos to 0402 252 511.

0402 252 511
[email protected]

5.0
34 Google reviews · read them →
Photos Optional, up to 6

    1. 1We call youOne of our experienced team talks it through with you.
    2. 2InspectionIf it needs a look, we measure, check the roof space and photograph everything.
    3. 3Fixed price in writingA clear proposal. Say yes and we lock in your date.